1 |
Technical |
Mechanical & Electrical Services for Buildings |
2-3 |
Bangi Resort Hotel |
2 |
Technical |
Basic Piping And Fittings |
2-3 |
Bangi Resort Hotel |
3 |
Technical |
Calibration Of Measuring Instruments |
2-3 |
Bangi Resort Hotel |
4 |
Technical |
L1 Certificate in Infrared Thermography |
7-11 |
Bangi Resort Hotel |
5 |
Technical |
HVAC System Technology - Principle & Application |
7-8 |
Bangi Resort Hotel |
6 |
Logistics |
Bill Of Lading In Global Shipping |
7-8 |
Bangi Resort Hotel |
7 |
Technical |
Fire Fighting System - Design & Standard in Malaysia |
9-10 |
Bangi Resort Hotel |
8 |
Technical |
Cooling Tower - Design, Operation & Maintenance |
9-10 |
Bangi Resort Hotel |
9 |
Technical |
Dandang dan Penjanaan Stim Untuk Boilerman |
9-10 |
Bangi Resort Hotel |
10 |
Technical |
Geotechnical Forensic Investigation |
14-15 |
Marriott Hotel Putrajaya |
11 |
Technical |
Basic Pneumatic And Hydraulic System |
14-15 |
Marriott Hotel Putrajaya |
12 |
Technical |
Slope Failure Analysis |
14-15 |
Marriott Hotel Putrajaya |
13 |
Technical |
Commercial LPG Operation, Safety & Regulations |
16-17 |
Marriott Hotel Putrajaya |
14 |
Technical |
Understanding of Tariff TNB (Basic) |
16-17 |
Marriott Hotel Putrajaya |
15 |
Technical |
Electrostatic Discharge Control |
16-17 |
Marriott Hotel Putrajaya |
16 |
Technical |
Understanding Of Uniform Building By Law (UBBL) |
21-22 |
Marriott Hotel Putrajaya |
17 |
Administration |
Best Practices in Procurement Management |
21-22 |
Marriott Hotel Putrajaya |
18 |
Human Resource |
Fundamentals Of Human Resource Management |
21-22 |
Marriott Hotel Putrajaya |
19 |
Technical |
Sistem Lift & Eskalator - Operasi & Senggaraan |
23-24 |
Marriott Hotel Putrajaya |
20 |
Technical |
Sistem Pencegahan Kebakaran : Operasi & Senggaraan Berkesan *HOT |
23-24 |
Marriott Hotel Putrajaya |
21 |
Technical |
Indoor Air Quality Control |
23-24 |
Marriott Hotel Putrajaya |
22 |
Technical |
Earthing & Electrical Protection System in Malaysia |
28-29 |
Bangi Resort Hotel |
23 |
Technical |
Chemical Spill & Splash Handling |
28-29 |
Bangi Resort Hotel |
24 |
Finance |
Accounting Basic - A Fresh Start |
28-29 |
Bangi Resort Hotel |
25 |
Technical |
Cold Room Operation and Maintenance |
30-1 |
Bangi Resort Hotel |
26 |
Technical |
Basic Vibration Analysis |
30-1 |
Bangi Resort Hotel |
27 |
Technical |
Industrial Hydraulics – Systems, Operation & Maintenance |
30-1 |
Bangi Resort Hotel |
28 |
Technical |
Sarawak - Electrical Engineering For Non Electrical Engineer *HOT |
28-29 |
The Waterfront Hotel, Kuching |
29 |
Technical |
Sarawak - Chiller System-Operation and Maintenance *HOT |
28-29 |
The Waterfront Hotel, Kuching |
30 |
Technical |
Sarawak - Sistem Pencegahan Kebakaran : Operasi & Senggaraan Berkesan *HOT |
28-29 |
The Waterfront Hotel, Kuching |
31 |
Technical |
Sarawak - Fiber Optic Design, Installation & Testing |
28-29 |
The Waterfront Hotel, Kuching |
32 |
Technical |
Sarawak - Mechanical & Electrical Services for Buildings |
30-1 |
The Waterfront Hotel, Kuching |
33 |
Technical |
Sarawak - Sistem Lift - Operasi & Senggaraan*HOT |
30-1 |
The Waterfront Hotel, Kuching |
34 |
Technical |
Sarawak - Pumps - Design, Application and Operation *HOT |
30-1 |
The Waterfront Hotel, Kuching |
35 |
Technical |
Sarawak - Fire Fighting System - Design & Standard in Malaysia |
30-1 |
The Waterfront Hotel, Kuching |